skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Field characterization plan for the 216-U-8 vitrified clay pipeline

Technical Report ·
DOI:https://doi.org/10.2172/10126123· OSTI ID:10126123

The 216-U-8 Crib was constructed in 1952 and received waste from 1952 to 1960 as described in Appendix A. This description of work details the field activities associated with the characterization of the vitrified clay pipe (VCP) delivery line to the 216-U-8 Crib and subsurface soil sampling along the pipe route in the 200 West Area of Hanford U Plant. It will serves as a field guide for those performing the work. Soil sampling locations will be determined by a combination of radiological surface surveys and internal camera surveys of the VCP line. Depending on the condition of the pipeline and field conditions, the objectives are as follows: examine the internal condition of the VCP with a survey camera to the extent allowed by field conditions; determine precise location and depth of the VCP; document VCP integrity; document gamma radiation profile through the VCP; and correlate any relationships between surface contamination zones at grade above the VCP to identify breaches in the pipe integrity.

Research Organization:
Westinghouse Hanford Co., Richland, WA (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC06-87RL10930
OSTI ID:
10126123
Report Number(s):
WHC-SD-EN-AP-154; ON: DE94007146; BR: 35AF11201/35AF11202; TRN: 94:004586
Resource Relation:
Other Information: PBD: 21 Jan 1994
Country of Publication:
United States
Language:
English