skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Optimization of the engineering design for the Lansing District Cooling System by comparative analysis of the impact of advanced technologies on a conventional design approach. Volume 1

Technical Report ·
DOI:https://doi.org/10.2172/10125208· OSTI ID:10125208

The Lansing Board of Water and Light (LBWL) began investigating development of a cooling district in the Lansing Downtown in 1989 in order to retain and build summer load for its steam utility. A feasibility study was conducted in conjunction with SFT, Inc. and ZBA, Inc. which addressed many factors such as marketability of the product, impact on the summer steam load, distribution system development, system design, probable capital and operating costs, reliability and environmental and other regulatory impacts on a preliminary feasibility basis. The Phase I study completed in September of 1989 provided highly promising results for establishing a District Cooling System (DCS). An existing chilled water production facility owned by the State of Michigan was identified as a potential location for a DCS plant. With these changes a review of the feasibility with a new set of alternatives and sensitivities was evaluated. This enhancement to the Phase I Study was nearing completion when the LBWL in conjunction with Energy, Mines and Resources Canada proposed to conduct the Phase II project in conjunction with DOE. The project was structured to proceed along a dual track to demonstrate the impact of the application of various innovative technologies.

Research Organization:
Lansing Board of Water and Light, MI (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
FG01-91CE26615
OSTI ID:
10125208
Report Number(s):
DOE/CE/26615-T1; ON: DE94007016
Resource Relation:
Other Information: PBD: [1994]
Country of Publication:
United States
Language:
English