Development of standardized air-blown coal gasifier/gas turbine concepts for future electric power systems. Volume 5, Appendix D: Cost support information: Final report
The cost estimate provided for the DOE sponsored study of Air Blown Coal Gasification was developed from vendor quotes obtained directly for the equipment needed in the 50 MW, 100 MW, and 200 MW sized plants and from quotes from other jobs that have been referenced to apply to the particular cycle. Quotes were generally obtained for the 100 MW cycle and a scale up/down factor was used to generate the cost estimates for the 200 MW and 50 MW cycles, respectively. Information from GTPro (property of Thermoflow, Inc.) was used to estimate the cost of the 200 MW and 50 MW gas turbine, HRSG, and steam turbines. To available the use of GTPro`s estimated values for this equipment, a comparison was made between the quotes obtained for the 100 MW cycle (ABB GT 11N combustion turbine and a HSRG) against the estimated values by GTPro.
- Research Organization:
- CRS Sirrine, Inc., Greenville, SC (United States). Power Div.
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC21-89MC26291
- OSTI ID:
- 10121400
- Report Number(s):
- DOE/MC/26291-3029-Vol.5; ON: DE92001128
- Resource Relation:
- Other Information: PBD: Jan 1991
- Country of Publication:
- United States
- Language:
- English
Similar Records
Development of standardized air-blown coal gasifier/gas turbine concepts for future electric power systems, Volume 4. Appendix C: Design and performance of standardized fixed bed air-blown gasifier IGCC systems for future electric power generation: Final report
Development of standardized air-blown coal gasifier/gas turbine concepts for future electric power systems, Volume 4