Test plan for K-Basin fuel handling tools
The purpose of this document is to provide the test plan and procedures for the acceptance testing of the handling tools enveloped for the removal of an N-Reactor fuel element from its storage canister in the K-Basins storage pool and insertion into the Single fuel Element Can for subsequent shipment to a Hot Cell for examination. Examination of these N-Reactor fuel elements is part of the overall characterization effort. New hand tools were required since previous fuel movement has involved grasping the fuel in a horizontal position. The 305 Building Cold Test Facility will be used to conduct the acceptance testing of the Fuel Handling Tools. Upon completion of this acceptance testing and any subsequent training of operators, the tools will be transferred to the 105 KW Basin for installation and use.
- Research Organization:
- Westinghouse Hanford Co., Richland, WA (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC06-87RL10930
- OSTI ID:
- 10119193
- Report Number(s):
- WHC-SD-SNF-TP-010; ON: DE95007182; BR: 35AF11201/35AF11202; TRN: AHC29508%%88
- Resource Relation:
- Other Information: PBD: 8 Feb 1995
- Country of Publication:
- United States
- Language:
- English
Similar Records
Design support document for the K Basins Vertical Fuel Handling Tools
Test reports for K Basins vertical fuel handling tools