skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Facility Effluent Monitoring Plan for the uranium trioxide facility

Technical Report ·
DOI:https://doi.org/10.2172/10119100· OSTI ID:10119100
;  [1];  [2]
  1. Westinghouse Hanford Co., Richland, WA (United States)
  2. Los Alamos Technical Associates, Inc., NM (United States)

A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438-01. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan shall ensure long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated at a minimum of every three years.

Research Organization:
Westinghouse Hanford Co., Richland, WA (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC06-87RL10930
OSTI ID:
10119100
Report Number(s):
WHC-EP-0470-1; ON: DE94005987; BR: 35AF11201/35AF11202; TRN: 94:007331
Resource Relation:
Other Information: PBD: Dec 1993
Country of Publication:
United States
Language:
English