Title: Heat exchanger bypass test report

Abstract

This test report documents the results that were obtained while conducting the test procedure which bypassed the heat exchangers in the HC-21C sludge stabilization process. The test was performed on November 15, 1994 using WHC-SD-CP-TC-031, ``Heat Exchanger Bypass Test Procedure.`` The primary objective of the test procedure was to determine if the heat exchangers were contributing to condensation of moisture in the off-gas line. This condensation was observed in the rotameters. Also, a secondary objective was to determine if temperatures at the rotameters would be too high and damage them or make them inaccurate without the heat exchangers in place.

Authors:
Publication Date:
Research Org.:
Westinghouse Hanford Co., Richland, WA (United States)
Sponsoring Org.:
USDOE, Washington, DC (United States)
OSTI Identifier:
10118017
Report Number(s):
WHC-SD-CP-TRP-060
ON: DE95006781; BR: 35AF11201/35AF11202; TRN: AHC29508%%23
DOE Contract Number:  
AC06-87RL10930
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: 26 Jan 1995
Country of Publication:
United States
Language:
English
Subject:
12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES; HANFORD RESERVATION; RADIOACTIVE WASTE FACILITIES; FURNACES; PERFORMANCE TESTING; HEAT EXCHANGERS; SHUTDOWN; VAPOR CONDENSATION; CORROSION; SLUDGES; RADIOACTIVE WASTE PROCESSING; EXHAUST SYSTEMS; EXPERIMENTAL DATA; PLUTONIUM; STABILIZATION; 052001; WASTE PROCESSING

Citation Formats

De Vries, M L. Heat exchanger bypass test report. United States: N. p., 1995. Web. doi:10.2172/10118017.
De Vries, M L. Heat exchanger bypass test report. United States. https://doi.org/10.2172/10118017
De Vries, M L. 1995. "Heat exchanger bypass test report". United States. https://doi.org/10.2172/10118017. https://www.osti.gov/servlets/purl/10118017.
@article{osti_10118017,
title = {Heat exchanger bypass test report},
author = {De Vries, M L},
abstractNote = {This test report documents the results that were obtained while conducting the test procedure which bypassed the heat exchangers in the HC-21C sludge stabilization process. The test was performed on November 15, 1994 using WHC-SD-CP-TC-031, ``Heat Exchanger Bypass Test Procedure.`` The primary objective of the test procedure was to determine if the heat exchangers were contributing to condensation of moisture in the off-gas line. This condensation was observed in the rotameters. Also, a secondary objective was to determine if temperatures at the rotameters would be too high and damage them or make them inaccurate without the heat exchangers in place.},
doi = {10.2172/10118017},
url = {https://www.osti.gov/biblio/10118017}, journal = {},
number = ,
volume = ,
place = {United States},
year = {Thu Jan 26 00:00:00 EST 1995},
month = {Thu Jan 26 00:00:00 EST 1995}
}