skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Engineering task plan for the vapor monitor installation into 241-C-103 tank

Abstract

A vapor flow monitor is to be installed into the 241-C-103 tank`s exhaust, just downstream of the HEPA filter. The flow monitor system includes the flow sensor, the baffle assembly, the signal conditioning and control electronics, and a chart recorder. The electronics package and the chart recorder are installed into a small, heated instrument cabinet that is mounted on the same steel pallet on which the flowmeter and the diffuser assembly is mounted. The flowmeter is connected to the HEPA filter with an unheated, un-insulated flex hose. An automatic drain, upstream of the flowmeter, is designed to automatically drain the condensate into an evaporating pan. The flowmeter is heated with a temperature controlled heater to avoid condensation.

Authors:
Publication Date:
Research Org.:
Westinghouse Hanford Co., Richland, WA (United States)
Sponsoring Org.:
USDOE, Washington, DC (United States)
OSTI Identifier:
10117709
Report Number(s):
WHC-SD-WM-ETP-107
ON: DE95006895; TRN: 95:001812
DOE Contract Number:  
AC06-87RL10930
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: Dec 1994
Country of Publication:
United States
Language:
English
Subject:
12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES; 42 ENGINEERING; TANKS; VENTILATION; GASEOUS WASTES; HANFORD RESERVATION; RADIOACTIVE WASTE STORAGE; FLOWMETERS; INSTALLATION; SIGNAL CONDITIONING; UNDERGROUND STORAGE; FLOW RATE; VAPORS; 052002; 420200; WASTE DISPOSAL AND STORAGE; FACILITIES, EQUIPMENT, AND TECHNIQUES

Citation Formats

Hertelendy, N A. Engineering task plan for the vapor monitor installation into 241-C-103 tank. United States: N. p., 1994. Web. doi:10.2172/10117709.
Hertelendy, N A. Engineering task plan for the vapor monitor installation into 241-C-103 tank. United States. https://doi.org/10.2172/10117709
Hertelendy, N A. 1994. "Engineering task plan for the vapor monitor installation into 241-C-103 tank". United States. https://doi.org/10.2172/10117709. https://www.osti.gov/servlets/purl/10117709.
@article{osti_10117709,
title = {Engineering task plan for the vapor monitor installation into 241-C-103 tank},
author = {Hertelendy, N A},
abstractNote = {A vapor flow monitor is to be installed into the 241-C-103 tank`s exhaust, just downstream of the HEPA filter. The flow monitor system includes the flow sensor, the baffle assembly, the signal conditioning and control electronics, and a chart recorder. The electronics package and the chart recorder are installed into a small, heated instrument cabinet that is mounted on the same steel pallet on which the flowmeter and the diffuser assembly is mounted. The flowmeter is connected to the HEPA filter with an unheated, un-insulated flex hose. An automatic drain, upstream of the flowmeter, is designed to automatically drain the condensate into an evaporating pan. The flowmeter is heated with a temperature controlled heater to avoid condensation.},
doi = {10.2172/10117709},
url = {https://www.osti.gov/biblio/10117709}, journal = {},
number = ,
volume = ,
place = {United States},
year = {Thu Dec 01 00:00:00 EST 1994},
month = {Thu Dec 01 00:00:00 EST 1994}
}