skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Functions and requirements for K Basin SNF characterization shipping

Technical Report ·
DOI:https://doi.org/10.2172/10116856· OSTI ID:10116856

This document details the plan for the shipping of fuel samples from the K Basins to the 300 Area for characterization. The fuel characterization project will evaluate the Hanford defense production fuel (N-Reactor and Single Pass Reactor) to support interim storage, transportation and final disposition. A limited number of fuel samples will be transported to a laboratory for analysis. It is currently estimated that 20 shipments of fuel per year for approximately 3 years (could be as long as 5 years) will be transported to the laboratory for analysis. Based on the NRC certificate of compliance each shipment is limited to 500 equivalent grams of {sup 235}U. In practical terms this will limit shipments to three outer elements or two assemblies of any type of N-Reactor or SPR fuel. Case by case determination of broken fuel will be made based on the type of fuel and maximum potential fissile content.

Research Organization:
Westinghouse Hanford Co., Richland, WA (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC06-87RL10930
OSTI ID:
10116856
Report Number(s):
WHC-SD-SNF-FRD-007; ON: DE95005632; TRN: 95:001735
Resource Relation:
Other Information: PBD: 10 Nov 1994
Country of Publication:
United States
Language:
English