Healy clean coal project. Technical quarterly progress report no. 6, April--June 1992
The objective of the Healy Clean Coal Project is to demonstrate the integration of an advanced combustor and a heat recovery system with both high and low temperature emission control processes. Resulting emission levels of SO{sub 2}, NO{sub x}, and particulates are expected to be significantly better than the federal New source Performance standards. During this past quarter, engineering and design continued on the boiler, combustion flue gas desulfurization (FGD), and turbine/generator systems. Balance of plant equipment procurement specifications continue to be prepared. Construction activities commenced as the access road construction got under way. Temporary ash pond construction and drilling of the supply well will be completed during the next quarter.
- Research Organization:
- Stone and Webster Engineering Corp., Boston, MA (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- FC22-91PC90544
- OSTI ID:
- 10114407
- Report Number(s):
- DOE/PC/90544-T5; ON: DE93006483
- Resource Relation:
- Other Information: PBD: Aug 1992
- Country of Publication:
- United States
- Language:
- English