skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Annual stability evaluation of Waste Isolation Pilot Plant

Technical Report ·
DOI:https://doi.org/10.2172/10114011· OSTI ID:10114011

A stability evaluation of the underground workings of the Waste Isolation Pilot Plant (WIPP) was completed by the US Bureau of Mines` WIPP evaluation committee. This work included a critical evaluation of the processes employed at WIPP to ensure stability, an extensive review of available deformation measurements, a 3-day site visit, and interviews with the Department of Energy (DOE) and Westinghouse staff. General ground control processes are in place at WIPP to minimize the likelihood that major stability problems will go undetected. To increase confidence in both short- and long-term stability throughout the site (underground openings and shafts), ground stability monitoring systems, mine layout design, support systems and data analyses must be continuously improved. Such processes appear to be in place at WIPP and are discussed in this paper.

Research Organization:
Bureau of Mines, Washington, DC (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC04-86AL31950
OSTI ID:
10114011
Report Number(s):
DOE/AL/31950-T8; ON: DE94005019; TRN: 94:002117
Resource Relation:
Other Information: PBD: Jun 1993
Country of Publication:
United States
Language:
English