Report of clean out and flushing of UO{sub 3} Plant processing equipment: Revision 1
The UO{sub 3} Plant went through a clean out leading to the deactivation of the facility. This clean out consisted of three phases. Phase 1 consisted of the removal of residual process material and the deactivation of most process equipment and instrumentation. Phase 2 consisted of the fixing or removal of contamination so storm water processing would be no longer required. Phase 3 consisted of the remaining activities that had to be completed before the facility was turned over to the Surplus Facility Program. Since the activities of Phase 2 and 3 were closely related, these two phases were worked simultaneously. The first part of this document summarizes the Phase 1 clean out procedures and their results. Phase 1 was completed on February 28, 1994. The second part summarizes the Phase 2/3 clean out procedures and their results. Phase 2/3 was completed before December 31, 1994. Because tanks and equipment were flushed simultaneously or in a specific sequence, the clean out processes are discussed per workplan.
- Research Organization:
- Westinghouse Hanford Co., Richland, WA (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC06-87RL10930
- OSTI ID:
- 10107301
- Report Number(s):
- WHC-SD-CP-RPT-012-Rev.1; ON: DE95004487; BR: 35AF11201/35AF11202; TRN: AHC29505%%51
- Resource Relation:
- Other Information: PBD: 2 Dec 1994
- Country of Publication:
- United States
- Language:
- English
Similar Records
Removal of the Plutonium Recycle Test Reactor - 13031
Work Management and Equipment Tag Out at the Tri-State G&T Craig Generating Station Craig, Colorado