skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Transition Armature Study. Progress report No. 4, February 1--March 31, 1992

Technical Report ·
DOI:https://doi.org/10.2172/10107180· OSTI ID:10107180

This forth report covers the period February 1 to March 31, 1992. During this period we: (1) performed numerical simulations of plasma brush formation and evolution with a 1D MHD code, (2) commenced testing hybrid armature brushes with a test fixture for studying hybrid armature brush behavior, (3) acquired 7m of the LTS railgun containment structure for a 3 year loan, (4) began evaluation of 3D Electro-Magnetic codes and their suitability to be interfaced to existing 3D stress/strain and thermal codes and (5) conducted a program review at LLNL.

Research Organization:
Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)
Sponsoring Organization:
Department of Defense, Washington, DC (United States)
DOE Contract Number:
W-7405-ENG-48
OSTI ID:
10107180
Report Number(s):
UCRL-ID-114850; ON: DE94003877
Resource Relation:
Other Information: PBD: 18 May 1992
Country of Publication:
United States
Language:
English