skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Intermediate scale borehole (Room C): In situ data report (January 1989--June 1993)

Technical Report ·
DOI:https://doi.org/10.2172/10105788· OSTI ID:10105788
 [1]; ; ; ;  [2]; ;  [3]
  1. Sandia National Labs., Albuquerque, NM (United States). Repository Isolation Systems Dept.
  2. RE/SPEC Inc., Albuquerque, NM (United States)
  3. Tech. Reps., Inc., Albuquerque, NM (United States)

Data are presented from the intermediate scale borehole test, an in situ test fielded in the pillar separating Rooms C1 and C2 at the Waste Isolation Pilot Plant (WIPP). The test was to provide data on the influence of scale, if any, on the structural behavior of underground openings in salt. These data include selected fielding information, test configuration, instrumentation activities, and comprehensive results from a large number of gages. Construction of the test began in December 1989, with the drilling of the intermediate scale borehole in December 1990. Gage data in this report cover the period from January 1989 through June 1993.

Research Organization:
Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC04-94AL85000
OSTI ID:
10105788
Report Number(s):
SAND-92-2470; ON: DE95004989; BR: GB0103012; TRN: AHC29503%%55
Resource Relation:
Other Information: PBD: Nov 1994
Country of Publication:
United States
Language:
English