Title: Engineering work plan for container venting system drill press assembly troubleshooting. Revision 1

Technical Report ·
DOI:https://doi.org/10.2172/10104874· OSTI ID:10104874

This work plan is for troubleshooting the current CVS drill press to ensure that the drill bit assembly doesn`t bind in the press plate. A drill press assembly has been fabricated for the Container Venting System (CVS). The drill bit assembly has bound in the press plate in previous revisions of this design. Initial troubleshooting of the drill press per Rev. 0 of this work plan was performed at the 200W Kaiser Machine Shop under Work Package 2H9401670F, Internal Work Order E20027. The drill press operated without jamming. Then, during the pre-operational test on 11/14/17 and the operational test on 11/17/94, two drum lids were drilled. Immediately after the test on 11/17/94, the drill was again operated, and it jammed. An inspection found shavings at the bottom of the drill bit assembly, between the drill bit sleeve and the press plate bore. This revised work plan provides direction for the machine shop to diagnose and correct this recent problem.

Research Organization:
Westinghouse Hanford Co., Richland, WA (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC06-87RL10930
OSTI ID:
10104874
Report Number(s):
WHC-SD-WM-WP-289-Rev.1; ON: DE95003992; TRN: 95:000482
Resource Relation:
Other Information: PBD: Nov 1994