Baseline risk assessment of ground water contamination at the inactive uraniferous lignite ashing site near Bowman, North Dakota
Abstract
This baseline risk assessment of ground water contamination at the inactive uraniferous lignite ashing site near Bowman, North Dakota, evaluates the potential impacts to public health or the environment from contaminated ground water at this site. This contamination is a result of the uraniferous lignite ashing process, when coal containing uranium was burned to produce uranium. Potential risk is quantified only for constituents introduced by the processing activities and not for the constituents naturally occurring in background ground water in the site vicinity. Background ground water, separate from any site-related contamination, imposes a percentage of the overall risk from ground water ingestion in the Bowman site vicinity. The US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project is developing plans to address soil and ground water contamination at the site. The UMTRA Surface Project involves the determination of the extent of soil contamination and design of an engineered disposal cell for long-term storage of contaminated materials. The UMTRA Ground Water Project evaluates ground water contamination. Based on results from future site monitoring activities as defined in the site observational work plan and results from this risk assessment, the DOE will propose an approach for managing contaminated groundmore »
- Publication Date:
- Research Org.:
- Jacobs Engineering Group, Inc., Albuquerque, NM (United States)
- Sponsoring Org.:
- USDOE, Washington, DC (United States)
- OSTI Identifier:
- 10104324
- Report Number(s):
- DOE/AL/62350-150
ON: DE95003885; BR: EW2010102/EX2040010; TRN: AHC29502%%79
- DOE Contract Number:
- AC04-91AL62350
- Resource Type:
- Technical Report
- Resource Relation:
- Other Information: PBD: Nov 1994
- Country of Publication:
- United States
- Language:
- English
- Subject:
- 11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS; NORTH DAKOTA; URANIUM MINES; BASELINE ECOLOGY; ASHES; RISK ASSESSMENT; GROUND WATER; CONTAMINATION; COMPILED DATA; ABANDONED SITES; REMEDIAL ACTION; ENVIRONMENTAL IMPACTS; COAL DEPOSITS; 053002; 053003; 054000; RADIOACTIVE EFFLUENTS; CHEMICAL AND THERMAL EFFLUENTS; HEALTH AND SAFETY
Citation Formats
. Baseline risk assessment of ground water contamination at the inactive uraniferous lignite ashing site near Bowman, North Dakota. United States: N. p., 1994.
Web. doi:10.2172/10104324.
. Baseline risk assessment of ground water contamination at the inactive uraniferous lignite ashing site near Bowman, North Dakota. United States. https://doi.org/10.2172/10104324
. 1994.
"Baseline risk assessment of ground water contamination at the inactive uraniferous lignite ashing site near Bowman, North Dakota". United States. https://doi.org/10.2172/10104324. https://www.osti.gov/servlets/purl/10104324.
@article{osti_10104324,
title = {Baseline risk assessment of ground water contamination at the inactive uraniferous lignite ashing site near Bowman, North Dakota},
author = {},
abstractNote = {This baseline risk assessment of ground water contamination at the inactive uraniferous lignite ashing site near Bowman, North Dakota, evaluates the potential impacts to public health or the environment from contaminated ground water at this site. This contamination is a result of the uraniferous lignite ashing process, when coal containing uranium was burned to produce uranium. Potential risk is quantified only for constituents introduced by the processing activities and not for the constituents naturally occurring in background ground water in the site vicinity. Background ground water, separate from any site-related contamination, imposes a percentage of the overall risk from ground water ingestion in the Bowman site vicinity. The US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project is developing plans to address soil and ground water contamination at the site. The UMTRA Surface Project involves the determination of the extent of soil contamination and design of an engineered disposal cell for long-term storage of contaminated materials. The UMTRA Ground Water Project evaluates ground water contamination. Based on results from future site monitoring activities as defined in the site observational work plan and results from this risk assessment, the DOE will propose an approach for managing contaminated ground water at the Bowman site.},
doi = {10.2172/10104324},
url = {https://www.osti.gov/biblio/10104324},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Tue Nov 01 00:00:00 EST 1994},
month = {Tue Nov 01 00:00:00 EST 1994}
}