Hydrodynamic Modeling Analysis of Union Slough Restoration Project in Snohomish River, Washington
A modeling study was conducted to evaluate additional project design scenarios at the Union Slough restoration/mitigation site during low tide and to provide recommendations for finish-grade elevations to achieve desired drainage. This was accomplished using the Snohomish River hydrodynamic model developed previously by PNNL.
- Research Organization:
- Pacific Northwest National Lab. (PNNL), Richland, WA (United States)
- Sponsoring Organization:
- USDOE
- DOE Contract Number:
- AC05-76RL01830
- OSTI ID:
- 1004544
- Report Number(s):
- PNNL-20076; 400403209; TRN: US1102957
- Country of Publication:
- United States
- Language:
- English
Similar Records
Hydrodynamic Modeling Analysis of Tidal Wetland Restoration in Snohomish River, Washington
Restoration of Hydrodynamic and Hydrologic Processes in the Chinook River Estuary, Washington – Feasibility Assessment
Restoration of Hydrodynamic and Hydrologic Processes in the Chinook River Estuary, Washington – Feasibility Assessment
Conference
·
Wed Mar 07 00:00:00 EST 2012
·
OSTI ID:1004544
Restoration of Hydrodynamic and Hydrologic Processes in the Chinook River Estuary, Washington – Feasibility Assessment
Conference
·
Thu Aug 03 00:00:00 EDT 2006
·
OSTI ID:1004544
Restoration of Hydrodynamic and Hydrologic Processes in the Chinook River Estuary, Washington – Feasibility Assessment
Conference
·
Sun Jan 01 00:00:00 EST 2006
·
OSTI ID:1004544