COMMISSIONING OF THE SPALLATION NEUTRON SOURCE ACCELERATOR SYSTEMS
- ORNL
The Spallation Neutron Source accelerator complex consists of a 2.5 MeV H- front-end injector system, a 186 MeV normal-conducting linear accelerator, a 1 GeV superconducting linear accelerator, an accumulator ring, and associated beam transport lines. The linac was commissioned in five discrete runs, starting in 2002 and completed in 2005. The accumulator ring and associated beam transport lines were commissioned in two runs from January to April 2006. With the completed commissioning of the SNS accelerator, the facility has begun initial low-power operations. In the course of beam commissioning, most beam performance parameters and beam intensity goals have been achieved at low duty factor. A number of beam dynamics measurements have been performed, including emittance evolution, transverse coupling in the ring, beam instability thresholds, and beam distributions on the target. The commissioning results, achieved beam performance and initial operating experience of the SNS will be discussed
- Research Organization:
- Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States). Spallation Neutron Source (SNS)
- Sponsoring Organization:
- USDOE Office of Science (SC)
- DOE Contract Number:
- DE-AC05-00OR22725
- OSTI ID:
- 932077
- Resource Relation:
- Conference: PAC07, Albuquerque, NM, USA, 20070624, 20070629
- Country of Publication:
- United States
- Language:
- English
Similar Records
Installation and commissioning of the ion source systems for the new spallation neutron source 2.5 MeV injector
Installation and commissioning of the ion source systems for the new spallation neutron source 2.5 MeV injector