skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Western Pond Turtle Head-starting and Reintroduction; 2002-2003 Progress Report.

Abstract

This report covers the results of the western pond turtle head-starting and reintroduction project for the period of June 2002-September 2003. Wild hatchling western pond turtles from the Columbia River Gorge were reared at the Woodland Park and Oregon Zoos in 2002 and 2003 as part of the recovery effort for this Washington State endangered species. The objective of the program is to reduce losses to introduced predators like bullfrogs and largemouth bass by raising the hatchlings to a size where they are too large to be eaten by most of these predators. In 2002, 27 females from the two Columbia Gorge populations were equipped with transmitters and monitored until they nested. Four more females carrying old transmitters were also monitored; only one of these transmitters lasted through the nesting season. In 2003, 30 females were monitored. Twenty-three of the females monitored in 2002 nested and produced 84 hatchlings. The hatchlings were collected in fall 2002 and reared in captivity at the Woodland Park and Oregon zoos in the head-start program. Twenty-seven of the turtles monitored in 2003 nested. Six of the turtles nested twice, producing a total of 33 nests. The nests will be checked in September and Octobermore » 2003 for hatchlings. Of 121 head-started juvenile western pond turtles collected in the Columbia Gorge during the 2001 nesting season, 119 were released at three sites in the Columbia Gorge in 2002, and 2 held over for additional growth. Of 86 turtles reared in the head-start program at the Woodland Park and Oregon Zoos fall 2002 through summer 2003, 67 were released at sites in the Columbia Gorge in summer of 2003, and 15 held over for more growth. Fifty-nine juveniles were released at Pierce National Wildlife Refuge in July 2002, and 51 released there in July 2003. Sixteen of those released in 2002 and 16 released in 2003 were instrumented with radio transmitters and monitored for varying amounts of time for survival and habitat use between the time of release and August 2003, together with juveniles from the 2001 release which were monitored from June 2001 through August 2003, and juveniles from the 2000 release which were monitored from August 2000 through August 2003. The number of functioning transmitters varied due to transmitter failures and detachments, and availability of replacement transmitters, as well as opportunities to recapture turtles. By August 15, 2003, a total of 39 turtles were being monitored: 6 from the 2000 release, 8 from the 2001 release, 10 from the 2002 release, and 15 from the 2003 release. During the 2002 field season trapping effort, 280 turtles were captured in the Columbia Gorge, including 236 previously head-started turtles. During the 2003 trapping season, 349 turtles were captured in the Columbia Gorge; 304 of these had been head-started. These recaptures, together with confirmed nesting by head-start females and visual re-sightings, indicate the program is succeeding in boosting juvenile recruitment to increase the populations. Records were also collected on 160 individual painted turtles captured in 2002 and 189 painted turtles captured in 2003 during trapping efforts at Pierce NWR, to gather baseline information on this native population. Eight female painted turtles were monitored by telemetry during the 2002 nesting season; 4 nests were recorded for these animals, plus 35 nests located incidentally. Preferred habitat for nesting was identified based on the telemetry results, to be considered in anticipating future turtle habitat needs and in management planning at Pierce NWR. Bonneville Power Administration (BPA) funding supported activities in the Columbia River Gorge from June 2002 through September 2003.« less

Authors:
; ;  [1]
  1. Washington Department of Fish and Wildlife, Wildlife Management Program, Olympia, WA
Publication Date:
Research Org.:
Washington Department of Fish and Wildlife
Sponsoring Org.:
United States. Bonneville Power Administration. Division of Fish and Wildlife
OSTI Identifier:
897302
Report Number(s):
DOE/BP-00005175-1
R&D Project: 200102700; TRN: US200704%%766
DOE Contract Number:  
00005175
Resource Type:
Technical Report
Country of Publication:
United States
Language:
English
Subject:
13 HYDRO ENERGY; 54 ENVIRONMENTAL SCIENCES; BONNEVILLE POWER ADMINISTRATION; COLUMBIA RIVER; ENDANGERED SPECIES; FEMALES; HABITAT; JUVENILES; MANAGEMENT; PLANNING; PONDS; RADIO EQUIPMENT; SEASONS; TELEMETRY; TRAPPING; TURTLES; Western pond turtle - Conservation - Columbia River Gorge (Or. and Wash.)

Citation Formats

Van Leuven, Susan, Allen, Harriet, and Slavin, Kate. Western Pond Turtle Head-starting and Reintroduction; 2002-2003 Progress Report.. United States: N. p., 2004. Web. doi:10.2172/897302.
Van Leuven, Susan, Allen, Harriet, & Slavin, Kate. Western Pond Turtle Head-starting and Reintroduction; 2002-2003 Progress Report.. United States. https://doi.org/10.2172/897302
Van Leuven, Susan, Allen, Harriet, and Slavin, Kate. 2004. "Western Pond Turtle Head-starting and Reintroduction; 2002-2003 Progress Report.". United States. https://doi.org/10.2172/897302. https://www.osti.gov/servlets/purl/897302.
@article{osti_897302,
title = {Western Pond Turtle Head-starting and Reintroduction; 2002-2003 Progress Report.},
author = {Van Leuven, Susan and Allen, Harriet and Slavin, Kate},
abstractNote = {This report covers the results of the western pond turtle head-starting and reintroduction project for the period of June 2002-September 2003. Wild hatchling western pond turtles from the Columbia River Gorge were reared at the Woodland Park and Oregon Zoos in 2002 and 2003 as part of the recovery effort for this Washington State endangered species. The objective of the program is to reduce losses to introduced predators like bullfrogs and largemouth bass by raising the hatchlings to a size where they are too large to be eaten by most of these predators. In 2002, 27 females from the two Columbia Gorge populations were equipped with transmitters and monitored until they nested. Four more females carrying old transmitters were also monitored; only one of these transmitters lasted through the nesting season. In 2003, 30 females were monitored. Twenty-three of the females monitored in 2002 nested and produced 84 hatchlings. The hatchlings were collected in fall 2002 and reared in captivity at the Woodland Park and Oregon zoos in the head-start program. Twenty-seven of the turtles monitored in 2003 nested. Six of the turtles nested twice, producing a total of 33 nests. The nests will be checked in September and October 2003 for hatchlings. Of 121 head-started juvenile western pond turtles collected in the Columbia Gorge during the 2001 nesting season, 119 were released at three sites in the Columbia Gorge in 2002, and 2 held over for additional growth. Of 86 turtles reared in the head-start program at the Woodland Park and Oregon Zoos fall 2002 through summer 2003, 67 were released at sites in the Columbia Gorge in summer of 2003, and 15 held over for more growth. Fifty-nine juveniles were released at Pierce National Wildlife Refuge in July 2002, and 51 released there in July 2003. Sixteen of those released in 2002 and 16 released in 2003 were instrumented with radio transmitters and monitored for varying amounts of time for survival and habitat use between the time of release and August 2003, together with juveniles from the 2001 release which were monitored from June 2001 through August 2003, and juveniles from the 2000 release which were monitored from August 2000 through August 2003. The number of functioning transmitters varied due to transmitter failures and detachments, and availability of replacement transmitters, as well as opportunities to recapture turtles. By August 15, 2003, a total of 39 turtles were being monitored: 6 from the 2000 release, 8 from the 2001 release, 10 from the 2002 release, and 15 from the 2003 release. During the 2002 field season trapping effort, 280 turtles were captured in the Columbia Gorge, including 236 previously head-started turtles. During the 2003 trapping season, 349 turtles were captured in the Columbia Gorge; 304 of these had been head-started. These recaptures, together with confirmed nesting by head-start females and visual re-sightings, indicate the program is succeeding in boosting juvenile recruitment to increase the populations. Records were also collected on 160 individual painted turtles captured in 2002 and 189 painted turtles captured in 2003 during trapping efforts at Pierce NWR, to gather baseline information on this native population. Eight female painted turtles were monitored by telemetry during the 2002 nesting season; 4 nests were recorded for these animals, plus 35 nests located incidentally. Preferred habitat for nesting was identified based on the telemetry results, to be considered in anticipating future turtle habitat needs and in management planning at Pierce NWR. Bonneville Power Administration (BPA) funding supported activities in the Columbia River Gorge from June 2002 through September 2003.},
doi = {10.2172/897302},
url = {https://www.osti.gov/biblio/897302}, journal = {},
number = ,
volume = ,
place = {United States},
year = {Sun Feb 01 00:00:00 EST 2004},
month = {Sun Feb 01 00:00:00 EST 2004}
}