skip to main content

SciTech ConnectSciTech Connect

Title: CH Packaging Program Guidance

The purpose of this document is to provide the technical requirements for preparation for use, operation, inspection, and maintenance of a Transuranic Package Transporter Model II (TRUPACT-II), a HalfPACT shipping package, and directly related components. This document complies with the minimum requirements as specified in the TRUPACT-II Safety Analysis Report for Packaging (SARP), HalfPACT SARP, and U.S. Nuclear Regulatory Commission (NRC) Certificates of Compliance (C of C) 9218 and 9279, respectively. In the event of a conflict between this document and the SARP or C of C, the C of C shall govern. The C of Cs state: "each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application." They further state: "each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application." Chapter 9.0 of the SARP charges the Waste Isolation Pilot Plant (WIPP) management and operating (M&O) contractor with assuring packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC-approved, users need to be familiar with Title 10 Code of Federal Regulations (CFR) §71.8. Anymore » time a user suspects or has indications that the conditions of approval in the C of C were not met, the Carlsbad Field Office (CBFO) shall be notified immediately. The CBFO will evaluate the issue and notify the NRC if required.« less
Publication Date:
OSTI Identifier:
Report Number(s):
DOE/WIPP-02-3183, Rev. 2
TRN: US1001758
DOE Contract Number:
Resource Type:
Technical Report
Research Org:
Waste Isolation Pilot Plant (WIPP), Carlsbad, NM
Sponsoring Org:
USDOE - Office of Environmental Management (EM)
Country of Publication:
United States
12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES; COMPLIANCE; CONTRACTORS; MAINTENANCE; MANAGEMENT; PACKAGING; REGULATIONS; SAFETY ANALYSIS; WIPP Transuranic Package Transporter Model II; TRUPACT-II; HalfPACT; TRUPACT-II Safety Analysis Report for Packaging; SARP; U.S. Nuclear Regulatory Commission; Certificates of Compliance; Waste Isolation Pilot Plant; WIPP; Title 10 Code of Federal Regulations; Carlsbad Field Office; bench stock; certified waste; O-ring; inspection; leakage; maintenance; mobile loading unit; nonconformance report; packaging; periodic maintenance; preshipment; test and handling equipment; transuranic; TRU; transuranic content codes; TRUCON; TRAMPAC; Transuranic Waste Authorized Methods for Payload Control