Engineering Task Plan for Hepa Filter Differential Pressure (DP) Fan Interlock Upgrades
This document provides a plan for installation of Differential Pressure (DP) fan interlocks on the primary ventilation systems in selected Tank Farm facilities. This plan contains the engineering tasks required for installation and is summarized by the Acceptance for Beneficial Use list. Individuals responsible for each task are identified and scheduled accordingly.
- Research Organization:
- COGEMA (US)
- Sponsoring Organization:
- ENVIRONMENTAL MANAGEMENT (US)
- DOE Contract Number:
- AC27-99RL14047
- OSTI ID:
- 803664
- Report Number(s):
- RPP-6180, Rev.0; EDT-626598; TRN: US0301604
- Resource Relation:
- Other Information: PBD: 19 May 2000
- Country of Publication:
- United States
- Language:
- English
Similar Records
HEPA Filter Differential Pressure Fan Interlock System Functional Requirements and Technical Design Criteria
Software Verification and Validation Test Report for the HEPA filter Differential Pressure Fan Interlock System
Scoping decision document for HEPA filter differential pressure interlock control installation and tank farm exhauster operation
Technical Report
·
Thu May 11 00:00:00 EDT 2000
·
OSTI ID:803664
Software Verification and Validation Test Report for the HEPA filter Differential Pressure Fan Interlock System
Technical Report
·
Tue Sep 05 00:00:00 EDT 2000
·
OSTI ID:803664
Scoping decision document for HEPA filter differential pressure interlock control installation and tank farm exhauster operation
Technical Report
·
Wed Jun 27 00:00:00 EDT 2001
·
OSTI ID:803664