244-AR Vault Interim Stabilization Project Plan
The 244-AR Vault Facility, constructed between 1966 and 1968, was designed to provide lag storage and treatment for the Plutonium-Uranium Extraction Facility (PUREX) tank farm sludges. Tank farm personnel transferred the waste from the 244-AR Vault Facility to B Plant for recovery of cesium and strontium. B Plant personnel then transferred the treatment residuals back to the tank farms for storage of the sludge and liquids. The last process operations, which transferred waste supporting the cesium/strontium recovery mission, occurred in April 1978. After the final transfer in 1978, the 244-AR facility underwent a cleanout. However, 2,271 L (600 gal) of sludge were left in Tank 004AR from an earlier transfer from Tank 241-AX-104. When the cleanout was completed, the facility was placed in a standby status. The sludge had been transferred to Tank 004AR to support Pacific Northwest National Laboratory [PNNL] vitrification work. Documentation of waste transfers suggests that a portion of the sludge may have been moved from Tank 004AR to Tank 002AR in preparation for transfer back to the AX Tank Farm; however, quantities of the sludge that were moved to Tank 002AR from that transfer must be estimated.
- Research Organization:
- CH2M Hill Hanford Group, Inc., Richland, WA (United States)
- Sponsoring Organization:
- ENVIRONMENTAL MANAGEMENT (US)
- DOE Contract Number:
- AC27-99RL14047
- OSTI ID:
- 801868
- Report Number(s):
- RPP-5635, Rev.0; EDT-628386; TRN: US0300305
- Resource Relation:
- Other Information: PBD: 24 Mar 2000
- Country of Publication:
- United States
- Language:
- English
Similar Records
Radioactive air emissions notice of construction use of a portable exhauster at 244-AR vault. Revision 2
Software Verification & Validation Report for the 244-AR Vault Interim Stabilization Ventilation System