skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Project W-314 241-AN-A valve pit upgrade acceptance for beneficial use

Abstract

This report identifies the responsibilities and requirements, applicable to the 241-AN-A Valve Pit Upgrades portion of Project W-314, for Acceptance for Beneficial Use in accordance with HNF-IP-0842, Vol IV, Sec 3.12. At project turnover, the end user accepts the affected Structures, Systems, and Components (SSCs) for beneficial use. This checklist is used to help the end user ensure that all documentation, training, and testing requirements are met prior to turnover. This checklist specifically identifies those items related to the upgrading of the 241-AN-A valve pit. The upgrades include: the installation of jumper/valve manifolds with position sensors, replacement pit leak detection systems, construction of replacement cover blocks, and electrical upgrades to support the instrumentation upgrades.

Authors:
Publication Date:
Research Org.:
TRS (US)
Sponsoring Org.:
ENVIRONMENTAL MANAGEMENT (US)
OSTI Identifier:
797552
Report Number(s):
HNF-SD-W314-ABU-002, Rev.2
TRN: US0201694
DOE Contract Number:  
AC06-96RL13200
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: 21 Jul 1999
Country of Publication:
United States
Language:
English
Subject:
12 MANAGEMENT OF RADIOACTIVE WASTES, AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES; STORAGE FACILITIES; VALVES; MODIFICATIONS; DOCUMENTATION; QUALITY ASSURANCE; INSTALLATION; LEAK DETECTORS; ELECTRICAL EQUIPMENT; ON-LINE MEASUREMENT SYSTEMS

Citation Formats

HAMMERS, J S. Project W-314 241-AN-A valve pit upgrade acceptance for beneficial use. United States: N. p., 1999. Web. doi:10.2172/797552.
HAMMERS, J S. Project W-314 241-AN-A valve pit upgrade acceptance for beneficial use. United States. https://doi.org/10.2172/797552
HAMMERS, J S. 1999. "Project W-314 241-AN-A valve pit upgrade acceptance for beneficial use". United States. https://doi.org/10.2172/797552. https://www.osti.gov/servlets/purl/797552.
@article{osti_797552,
title = {Project W-314 241-AN-A valve pit upgrade acceptance for beneficial use},
author = {HAMMERS, J S},
abstractNote = {This report identifies the responsibilities and requirements, applicable to the 241-AN-A Valve Pit Upgrades portion of Project W-314, for Acceptance for Beneficial Use in accordance with HNF-IP-0842, Vol IV, Sec 3.12. At project turnover, the end user accepts the affected Structures, Systems, and Components (SSCs) for beneficial use. This checklist is used to help the end user ensure that all documentation, training, and testing requirements are met prior to turnover. This checklist specifically identifies those items related to the upgrading of the 241-AN-A valve pit. The upgrades include: the installation of jumper/valve manifolds with position sensors, replacement pit leak detection systems, construction of replacement cover blocks, and electrical upgrades to support the instrumentation upgrades.},
doi = {10.2172/797552},
url = {https://www.osti.gov/biblio/797552}, journal = {},
number = ,
volume = ,
place = {United States},
year = {Wed Jul 21 00:00:00 EDT 1999},
month = {Wed Jul 21 00:00:00 EDT 1999}
}