Focused feasibility study final field sampling plan
At the direction of APG-DSHE, the project has been separated into three work phases to allow for data evaluation and risk determination before a full focused feasibility study is conducted. Phase I of the project consists of an aerial photography investigation, surface/marine geophysical surveys, a flowmeter logging program, sampling surface and subsurface soils, an ecological risk assessment of the Beach Point Test Site, and analysis of chemical groundwater data generated through the separate Canal Creek Groundwater Monitoring Program. Tasks described for Phase II of the FFS will be performed upon evaluation of data needs identified subsequent to completion of the Phase I tasks. Phase II investigations include installation fo additional groundwater monitoring wells, sampling of the new and previously existing monitoring wells, a flowmeter logging program, downhole geophysical logging of new monitoring wells (and one previously existing well), and possible soil gas surveys.
- Research Organization:
- Aberdeen Proving Ground, MD (United States). Environmental Management Program
- OSTI ID:
- 7297142
- Report Number(s):
- AD-A-277445/3/XAB
- Country of Publication:
- United States
- Language:
- English
Similar Records
Work plan for focused feasibility study of the toxic burning pits area at J-Field, Aberdeen Proving Ground, Maryland
Remedial investigation sampling and analysis plan for J-Field, Aberdeen Proving Ground, Maryland. Volume 1: Field Sampling Plan
Related Subjects
45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEFENSE
GROUND WATER
CONTAMINATION
REMEDIAL ACTION
FEASIBILITY STUDIES
CHEMICAL WARFARE AGENTS
HYDROGEN COMPOUNDS
OXYGEN COMPOUNDS
WATER
WEAPONS
540250* - Environment
Terrestrial- Site Resource & Use Studies- (1990-)
450600 - Military Technology
Weaponry
& National Defense- Chemical & Biological- (1990)