Shougang No. 2 blast furnace enlargement
Conference
·
· Iron and Steel Engineer; (United States)
OSTI ID:7136835
- Shougang Iron and Steel Corp., Beijing (China)
Shougang is expanding to become a 10 million ton/year steel plant in 1995. In 1990, the capacity of Shougang No. 2 blast furnace was enlarged from 1,327 to 1,726 cu meters. The project consisted of building a new furnace on the old site while maintaining the operation of the old furnace. The project was completed in 188 calendar days, 3 days ahead of schedule. Shougang has a large, comprehensive technical force that includes design, construction and production. Most of the equipment and instrumentation, both mechanical and electrical, were fabricated by Shougang personnel. The future increase in capacity of No. 1, 3 and 4 blast furnaces will exceed that of No. 2 furnace.
- OSTI ID:
- 7136835
- Report Number(s):
- CONF-9409223-; CODEN: IRSEA5
- Journal Information:
- Iron and Steel Engineer; (United States), Vol. 71:9; Conference: 1994 Association of Iron and Steel Engineers (AISE) annual convention, Cleveland, OH (United States), 19-21 Sep 1994; ISSN 0021-1559
- Country of Publication:
- United States
- Language:
- English
Similar Records
Blast furnace gas fired boiler for Eregli Iron and Steel Works (Erdemir), Turkey
New technologies adopted in the construction of new No. 3 blast furnace at WISCO
Blow-down and blow-in of Inland`s No. 7 blast furnace
Conference
·
Fri Nov 01 00:00:00 EST 1996
·
OSTI ID:7136835
+1 more
New technologies adopted in the construction of new No. 3 blast furnace at WISCO
Conference
·
Fri Jan 01 00:00:00 EST 1993
· Proceedings, Ironmaking Conference; (United States)
·
OSTI ID:7136835
Blow-down and blow-in of Inland`s No. 7 blast furnace
Conference
·
Fri Dec 01 00:00:00 EST 1995
·
OSTI ID:7136835