skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Installation-restoration program, Phase 2. Confirmation/quantification Stage 2. Final report, 15 July 1986-7 July 1987

Technical Report ·
OSTI ID:7126350

Three sites were investigated at Elelson AFB during the Phase II, Stage 2 field evaluation of the IRP. The sites were the sewage-treatment-plant spill ponds and treated-effluent leaching ponds (Site 32) and two base landfills (Sites 2 and 1). A geophysical survey was performed in the vicinity of the sludge-treatment plant to help define areas of high electromagnetic conductivity (i.e., potential contamination) and aid in the placement of monitor wells. Eight monitor wells were installed during Stage 2. Ground-water samples from Stage 1 and Stage 2 wells were analyzed for purgeable lead, arsenic, cadmium, chromium, mercury, and silver. Soil samples from the vicinity of one of the landfills (Site 1) were tested for the presence of pesticides. Trace quantities of purgeable halocarbons and petroleum hydrocarbons were detected in the wells from all three sites. Drinking-water standards for total trihalomethanes were not exceeded for any of these samples. Arsenic and cadmium were detected in wells at concentrations elevated in the vicinity of the sewage-treatment plant. Only one well, in close proximity to the sewage-sludge drying beds, was found to have nitrate, nitrite concentrations above the Primary Drinking Water Standard. A well downgradient from this site had nitrate, nitrite levels below the same standard. Soils at Site 1 contain trace quantities of DDE, DDD, and DDT. No pesticides were detected in ground water from the monitor well at this site.

Research Organization:
Dames and Moore, Park Ridge, IL (USA)
OSTI ID:
7126350
Report Number(s):
AD-A-193106/2/XAB
Country of Publication:
United States
Language:
English