Title: Remote disassembly of the absorber open-test assembly at the FFTF/IEM cell

Conference · · Transactions of the American Nuclear Society; (United States)
OSTI ID:7088256

The Fast Flux Test Facility (FFTF) interim examination and maintenance (IEM) cell is used for the remote disassembly of irradiated fuel and material experiments. The absorber open-test assembly (AOTA) is a 12-m (40-ft)-long instrumented absorber (control-rod-material) test assembly. Its primary purpose is to characterize the FFTF control-rod-material reaction rate during reactor operation. Instrumentation allowed temperature and pressure measurements at various locations in several absorber pins during reactor operation. After residing several months in the reactor, the assembly was transferred to the IEM cell by the closed-loop ex-vessel machine (CLEM) for separation of the irradiated portion of the experiment from the instrument stalk. After separation, the 3.6-m (12-ft)-long assembly was processed through the sodium removal system and shipped off-site for examination. This success allowed the timely completion of a major task on the FFTF operations schedule.

OSTI ID:
7088256
Report Number(s):
CONF-901101-; CODEN: TANSAO
Journal Information:
Transactions of the American Nuclear Society; (United States), Vol. 62; Conference: American Nuclear Society (ANS) winter meeting, Washington, DC (United States), 11-16 Nov 1990; ISSN 0003-018X