Trojan technical specification verification project
The Trojan Technical Specification Verification (TTSV) project at the Trojan plant of Portland General Electric Company was motivated by the recognition that many numbers in the Trojan technical specifications (TTS) potentially lacked the consideration of instrument- and/or process-related errors. The plant setpoints were known to consider such errors, but many of the values associated with the limiting conditions for operation (LCO) did not. In addition, the existing plant instrument error analyses were based on industry values that do not reflect the Trojan plant-specific experience. The purpose of this project is to ensure that the Trojan plant setpoint and LCO values include plant-specific instrument error.
- OSTI ID:
- 7074081
- Report Number(s):
- CONF-911107-; CODEN: TANSA; TRN: 92-030875
- Journal Information:
- Transactions of the American Nuclear Society; (United States), Vol. 63; Conference: 1991 Winter meeting of the American Nuclear Society (ANS) session on fundamentals of fusion reactor thermal hydraulics, San Francisco, CA (United States), 10-15 Nov 1991; ISSN 0003-018X
- Country of Publication:
- United States
- Language:
- English
Similar Records
Technical evaluation of RETS-required reports for Trojan Nuclear Plant for 1983
Technical safety requirements control level verification
Related Subjects
21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS
TROJAN REACTOR
REACTOR SAFETY
SPECIFICATIONS
ACCURACY
ADMINISTRATIVE PROCEDURES
ALARM SYSTEMS
CALIBRATION
COMPLIANCE
DOCUMENTATION
ELECTRIC UTILITIES
ENGINEERED SAFETY SYSTEMS
ERRORS
RADIATION MONITORING
REACTOR INSTRUMENTATION
ENRICHED URANIUM REACTORS
MONITORING
POWER REACTORS
PUBLIC UTILITIES
PWR TYPE REACTORS
REACTORS
SAFETY
THERMAL REACTORS
WATER COOLED REACTORS
WATER MODERATED REACTORS
220900* - Nuclear Reactor Technology- Reactor Safety
210200 - Power Reactors
Nonbreeding
Light-Water Moderated
Nonboiling Water Cooled