Cost and design study of modular small hydro plants. Volume 2. Appendixes. Final report
Technical Report
·
OSTI ID:7065243
The following appendices are included: major mechanical equipment and auxiliary electrical equipment for pumps as turbines (PAT), siphon penstock, prefabricated powerhouse, reliability of PAT installations, representative site investigation data, and case studies of four sites. (MHR)
- Research Organization:
- Acres American, Inc., Buffalo, NY
- OSTI ID:
- 7065243
- Report Number(s):
- EPRI-EM-3534-Vol.2; ON: TI84920434
- Country of Publication:
- United States
- Language:
- English
Similar Records
Cost and design study of modular small hydro plants. Volume 1. Cost and design study. Final report
Cost and design study of modular small hydro plants. Volume 3. Application manual. Final report
Cost and design study of modular small hydro plants. Volume 4. Siphon penstock model test report. Final report
Technical Report
·
Fri Jun 01 00:00:00 EDT 1984
·
OSTI ID:7065243
Cost and design study of modular small hydro plants. Volume 3. Application manual. Final report
Technical Report
·
Fri Jun 01 00:00:00 EDT 1984
·
OSTI ID:7065243
Cost and design study of modular small hydro plants. Volume 4. Siphon penstock model test report. Final report
Technical Report
·
Fri Jun 01 00:00:00 EDT 1984
·
OSTI ID:7065243