Title: ESF (Exploratory Shaft Facility) flexibility analysis

Technical Report ·
OSTI ID:6972789

This report directs that uncertainty allowances be included within the ESF facilities. The recommendations herein developed are intended as input to Title II Design criteria. Flexibility is measured first by lineal ft of drift, and then by hoisting rate and capacity of supporting utilities and services. A defined probability of need shows an extra 10,000 ft of drift for the first level of flexibility responding to testing and operations, and over 60,000 ft of drift for the second level of flexibility which recognizes possible need for perimeter drifting to investigate geologic stratigraphy. Observing there will be time constraints, a single shaft muck hoisting rate up to 170 to 250 tons per hour is recommended. The potential hoisting rate recommended for flexibility should be satisfied by a hoist approximately equivalent to, or conveniently upgraded from those being considered for sinking and construction, or 1000 horsepower. The cost of flexibility is limited to engineering planning and design (mostly conceptual) which makes later expansion achievable, and to selected items for initial construction where later upgrading would be impractical, impossible, or very costly. The cost is fixed to the level of flexibility and does not vary with excavated footage. The incremental margin is only a small fraction of the additional footage made available. Flexibility presents a strategy and not a position of design or technology. Examples used in this report are intended to be illustrative only, and not to lead design or cost estimates. 7 tabs.

Research Organization:
Battelle Memorial Inst., Columbus, OH (USA). Office of Nuclear Waste Isolation
DOE Contract Number:
AC02-87CH10290
OSTI ID:
6972789
Report Number(s):
BMI/ONWI/C-218; ON: TI88016603
Country of Publication:
United States
Language:
English