Installing micro-hydro in the developing nations
Journal Article
·
· Alternative Sources Energy; (United States)
OSTI ID:6895685
The difficulties encountered in installing a micro-hydroelectric power system in Korupun, a mission station/community located in the highlands of Irian Jaya, Indonesia are discussed. Initial construction resulted in the completion of a diversion structure, a 400 ft. power canal, a settling pond, intake works and a power house foundation. The site itself would use less than minimum stream-flow, a 900 ft. penstock and 150 ft. of net effective head to produce 12 kilowatts of electricity.
- Research Organization:
- Hydro Tech Systems, Inc., Chattary, WA
- OSTI ID:
- 6895685
- Journal Information:
- Alternative Sources Energy; (United States), Vol. 78
- Country of Publication:
- United States
- Language:
- English
Similar Records
Introducing a [open quote]modular[close quote] approach to fish screen installation
Preliminary design study of underground pumped hydro and compressed-air energy storage in hard rock. Volume 2. Project design criteria: UPH. Final report
Exploration of the Mesozoic in the eastern part of Indonesia: Its reward and risk
Journal Article
·
Tue Dec 01 00:00:00 EST 1992
· Hydro Review; (United States)
·
OSTI ID:6895685
+1 more
Preliminary design study of underground pumped hydro and compressed-air energy storage in hard rock. Volume 2. Project design criteria: UPH. Final report
Technical Report
·
Fri May 01 00:00:00 EDT 1981
·
OSTI ID:6895685
Exploration of the Mesozoic in the eastern part of Indonesia: Its reward and risk
Conference
·
Mon Jan 01 00:00:00 EST 1996
· AAPG Bulletin
·
OSTI ID:6895685
+1 more