Title: The magnetohydrodynamics Coal-Fired Flow Facility

Technical Report ·
OSTI ID:6768734

In this quarterly technical Progress report, UTSI reports on continued technical progress in developing the technology for the steam bottoming plant for an MHD Steam combined cycle Power plant. No testing was conducted during the quarter. Major activities were in preparation for the beginning of the 2000 hour POC testing on wester, low sulfur coal scheduled to start in April 1992. The report contains analyses of data from the previous tests in this series that were designed to prepare for the POC test series. Modifications to the flow train that are reported include the rearrangement of the lower temperature heat exchangers in the superheater test module (SHTM) to move the air heater upstream to a higher gas temperature, installation of a gas by-pass to keep the ash seed hopper tap open and installation of the new tubes to be tested in the steam cooled test sections. The major facility modification discussed is the installation of the wet electrostatic precipitator, to replace the venturi scrubber that has been used in previous testing, to take any flow that is not desired through the dry electrostatic precipitator or baghouse. Plans for future testing that are summarized include improvements in test operations, the details of arrangement of high temperature air heater materials for testing and the plans for advanced instrumentation by both UTSI and Mississippi State University.

Research Organization:
Tennessee Univ., Tullahoma, TN (United States). Space Inst.
Sponsoring Organization:
USDOE; USDOE, Washington, DC (United States)
DOE Contract Number:
AC02-79ET10815
OSTI ID:
6768734
Report Number(s):
DOE/ET/10815-181; UTSI-92-02; ON: DE93008881
Country of Publication:
United States
Language:
English