Title: Test OPTRAN 1-1 results. [BWR]

Conference ·
OSTI ID:6546002

The objective of the OPT 1-1 Test Series was to evaluate the extent of damage and the threshold for failure during simulated BWR anticipated transients. Four power transient tests with progressively higher power levels were performed with preirradiated fuel rods at power ramp rates as high as 550 kW/m per second. Six separately shrouded fuel rods fabricated by the General Electric Co., and preirradiated in the Monticello BWR to burnups of about 5000 to 23,000 MWd/t were tested, four at a time. Four of the fuel rods were of typical GE 8 x 8 design, except for fuel length (0.75 m). Two of the rods included design modifications to improve their PCI-resistant characteristics. A lengthy fuel conditioning preceded the transient testing of the fuel rods.

Research Organization:
EG and G Idaho, Inc., Idaho Falls (USA)
DOE Contract Number:
AC07-76ID01570
OSTI ID:
6546002
Report Number(s):
EGG-M-21982; CONF-821037-60; ON: DE83004842
Resource Relation:
Conference: 10. water reactor safety research information conference, Gaithersburg, MD, USA, 12 Oct 1982
Country of Publication:
United States
Language:
English