skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Incident report. Tube Bank C-metal wastage status report, November 1982

Technical Report ·
OSTI ID:6349001

During the Hot Commissioning tests in preparation for Test Series 2, a significant degree of metal wastage occurred on the external surfaces of Tube Bank 'C'. The extent of the metal wastage was unexpected and has been a matter of concern to the Project. The report provides a history of the operational period for Tube Bank 'C' and details the measurements of metal wastage that have been recorded. The project has initiated an extensive study of the possible cause, or causes, of the metal wastage and these are discussed. Operational tests are to be carried out at Grimethorpe, CURL and CRE with a view to determining the mechanism of metal wastage that exists within the fluidized bed. The results of these tests will be reported and will form the basis for the design of a new bank, which will be installed in the combustor in due course, if required. The Project is taking necessary steps to ensure that the cause of the metal wastage is fully investigated and that the resultant slippage in the Test Series 2 schedule is minimised.

Research Organization:
NCB (IEA Grimethorpe) Ltd., Barnsley, South Yorkshire (UK)
OSTI ID:
6349001
Report Number(s):
DOE/METC-83-54; GEF/U-82/21; ON: DE83008239
Resource Relation:
Other Information: Portions are illegible in microfiche products. Original copy available until stock is exhausted
Country of Publication:
United States
Language:
English