Title: Engineer, design, construct, test and evaluate a pressurized fluidized bed pilot plant using high sulfur coal for production of electric power. Phase III. Pilot plant construction. Final report

Technical Report ·
OSTI ID:5992148

This final report describes the coal-fired plant design capable of producing electric power in an environmentally clean manner. The report presents the predicted performance using high sulfur bituminous coal and summarizes the construction activities and changes through completion on November 30, 1983. The construction activities involved: (1) the site excavation and pouring foundations for the PFB process equipment structural tower, control building, dolomite silo, boost compressor, and various equipment footings; (2) the fabrication and erection of the support steel work for the process equipment tower, control building, rail car thaw shed, and particulate scrubber and exhaust stack; (3) the fabrication and erection of the process equipment including the PFB combustor vessel, windbox, in-bed heat exchanger and process piping, the ash recycle system, the gas clean-up system, the ash removal, cooling and storage system, the coal handling, preparation and injection systems, the dolomite receiving, handling, storage and injection systems, the boost air compressor, dryer and receiver systems, the purge instrument and service air systems, the control, instrument and electrical systems, the tower elevator, the cardox, Halon and water fire protection system, etc. In addition, modifications and refurbishment were completed on the existing equipment at the site which was incorporated into the Pilot Plant system. Finally, plans were prepared describing the operating procedures, maintenance requirements, spare parts list, training program and manpower requirements for the proposed Phase IV test evaluation program. 37 figures, 11 tables.

Research Organization:
Curtiss-Wright Corp., Wood-Ridge, NJ (USA). Power Systems Div.
DOE Contract Number:
FC21-82MC19363
OSTI ID:
5992148
Report Number(s):
DOE/MC/19363-1713; ON: DE85005329
Resource Relation:
Other Information: Portions are illegible in microfiche products. Original copy available until stock is exhausted
Country of Publication:
United States
Language:
English