Reliability analysis for LEB ring magnet power system in SSC
Conference
·
OSTI ID:5986268
The LEB ring magnet power system contains six subsystems, supervisory control, power supplies, regulation, DC bus, resonant cells, and fault sensing network. The system availability of the total LEB RMPS is required to be 0.999. The work in this paper is to allocate the overall LEB RMPS reliability requirement into reliability requirements for each of the subsystems and lower-tier items. The Feasibility-of-Objective technique combining with engineering experience is the key for the allocation. MIL-HDBK-217F is used to derate SCR components. 7 refs., 5 figs.
- Research Organization:
- Superconducting Super Collider Lab., Dallas, TX (United States)
- Sponsoring Organization:
- USDOE; USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC35-89ER40486
- OSTI ID:
- 5986268
- Report Number(s):
- SSCL-Preprint-7; CONF-911106-19; ON: DE92003000; TRN: 91-033025
- Resource Relation:
- Conference: IEEE nuclear science symposium, Santa Fe, NM (United States), 5-9 Nov 1991
- Country of Publication:
- United States
- Language:
- English
Similar Records
Reliability analysis for LEB ring magnet power system in SSC
An updated overview of the LEB rf system
An updated overview of the LEB rf system
Conference
·
Sat Aug 01 00:00:00 EDT 1992
· IEEE Transactions on Nuclear Science (Institute of Electrical and Electronics Engineers); (United States)
·
OSTI ID:5986268
An updated overview of the LEB rf system
Conference
·
Sun Mar 01 00:00:00 EST 1992
·
OSTI ID:5986268
+1 more
An updated overview of the LEB rf system
Conference
·
Sun Mar 01 00:00:00 EST 1992
·
OSTI ID:5986268
+1 more