Maintenance scheduling
The requirements for daily, weekly, monthly and overtime maintenance scheduling of coal-fired power plants are discussed. It is concluded that maintenance scheduling is as essential as the physical performance of the work itself. By prescheduling maintenance, the optimum utilization of manpower and equipment reliability will be obtained. Spare parts, special tools and service engineer requirements can be anticipated with reasonable scheduling. Meetings are a distasteful word in anyone's vocabulary. However, close communication, between operation and maintenance, is a must to insure that both departments are aware of the job status and progress. Improved communication and scheduling of equipment maintenance can help break down the barrier that has developed between the two Departments.
- Research Organization:
- Board of Water and Light, Lansing, MI (USA)
- OSTI ID:
- 5793913
- Report Number(s):
- CONF-8004173-6; ON: DE82900266
- Resource Relation:
- Conference: 19. annual Kentucky industrial coal conference, Lexington, KY, USA, 30 Apr 1980
- Country of Publication:
- United States
- Language:
- English
Similar Records
Personnel Certifications for the Design, Installation and Maintenance of Photovoltaic Systems. Final Technical Report
14 Steps to Creating Value in Cost and Schedule Resources for Nuclear Waste Management - 20188