skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Evaluation of the Serpentix Conveying System. Final technical report

Technical Report ·
DOI:https://doi.org/10.2172/5657000· OSTI ID:5657000

The Serpentix Conveying System, a Peabody Coal Company underground continuous face haulage invention, was evaluated to determine its viability in room-and-pillar mining. The Serpentix is a mobile, flexible belt conveyor which is suspended from the mine roof. It was operated in the Illinois No. 6 Mine No. 1 at Marissa, Illinois and Mine No. 10 at pawnee, Illinois. Production rates in excess of 1100 raw tons per eight-hour shift were demonstrated. Conceptual designs were developed to suspend the Serpentix system from chocks for shortwall mining applications.

Research Organization:
Peabody Coal Co., St. Louis, MO (USA)
DOE Contract Number:
ET-76-C-01-8878
OSTI ID:
5657000
Report Number(s):
FE-8878-T1
Country of Publication:
United States
Language:
English