EEAP boiler and chiller study at Fort Sam Houston, Texas. Final report
This energy conservation study was performed by Huitt-Zollars Inc, for the U.S. Army Engineer District (USAED), Fort Worth, under contract number DACAC63-94-D-0015. The study was conducted at Fort Sam Houston (FSH) in San Antonio, Texas, between November 28, 1994 and June 15, 1995. The site survey, data collection and analysis was performed by John Carter, E.I.T, Tom Holthaus, P.E., Walter H. Williams III, P.E., and C.A. Pieper, P.E.. The purpose of the study was to perform a limited site survey of specific buildings at the facility, identify specific Energy Conservation Opportunities (ECOs) that exist, and then evaluate these ECOs for technical and economic feasibility. These ECOs were limited to central boiler and chiller plant systems serving specific building groups at FSH.
- Research Organization:
- Huitt-Zollars, Inc., Fort Worth, TX (United States)
- OSTI ID:
- 564470
- Report Number(s):
- AD-A-330656/0/XAB; CNN: Contract DACA63-94-D-0015; TRN: 73560327
- Resource Relation:
- Other Information: PBD: 18 Sep 1995
- Country of Publication:
- United States
- Language:
- English
Similar Records
EEAP boiler and chiller study II at Fort Sam Houston, San Antonio, Texas. Volume I
EEAP lighting survey study at the Fort Bliss, El Paso, Texas. Volume I. Final report