Title: Solvent changeouts without plant shutdown

Conference ·
OSTI ID:5567330
;  [1]
  1. Taylor, Weiland and Associates, Inc., Potsdam, NY (US)

For reasons of greater selectivity, lower regeneration energy requirements, reduced corrosivity and possible greater amine stability, MDEA continues to replace DEA in numerous selective H/sub 2/S removal applications. Solvent changeouts from DEA to MDEA often require no equipment modification, yet they are generally achieved by shutting down the plant, draining the old solvent, cleaning, and finally recharging with MDEA. However, in at least one plant, solvent changeout was done on the fly simply by periodically making up normal DEA losses with MDEA until the plant was finally operating on MDEA alone. Gradual solvent changeouts have the advantages of no lost production, no disposal problems with the environmentally-hazardous old solvent, no use and subsequent disposal of cleaning agents, and no additional manpower requirements. An advanced flowsheet simulation capability can suggest when such a procedure is feasible and, when it is, plant simulation can help to ensure that the solvent changeout is done reliably and with no production or cost penalties. GASPLANT-PLUS(TM) is currently the only commercial simulator having formulated solvent (mixed amine) capabilities within a fully flexible flowsheeting environment. After highlighting its technical foundations, they will compare GASPLANT-PLUS predictions with some commercial plant data and, through examples, they will show how solvent changeouts can be done gradually, without plant shutdown.

OSTI ID:
5567330
Report Number(s):
CONF-880348-
Resource Relation:
Conference: American Institute of Chemical Engineers spring national meeting, New Orleans, LA (USA), 6-10 Mar 1988; Other Information: Technical Paper 80B
Country of Publication:
United States
Language:
English