Title: Through bore subsea christmas trees

Conference ·
OSTI ID:5442701

The workovers of subsea completed wells are expensive and time consuming as even the most routine tasks must be carried out by a semi-submersible. This paper describes the economic, safety and operational advantages which led to the development and successful first installation of 'through bore' subsea production trees. The conventional wet subsea trees have proved to be very reliable over the past ten years of operation in the Argyll, Duncan and Innes fields, however the completion strings require pulling on the average about once every three to five years. The conventional subsea tree/tubing hanger set up design requires the tree to be tripped and a rig BOP stack run to pull the tubing. This operation is time consuming, very weather sensitive and leaves the well temporarily without a well control stack on the wellhead. The 7 1/16'' 'through bore' subsea tree was developed to minimize the tubing pulling workover time and several trees have been run successfully since the latter part of 1984. The time saving on a tubing pulling workover is three days. In addition, the design considerably reduces the hazards and equipment damage risk inherent in the conventional design. Hamilton Brothers and National Supply Company in Aberdeen designed the equipment which must be considered a new generation of subsea production trees.

OSTI ID:
5442701
Report Number(s):
CONF-850941-
Resource Relation:
Conference: European offshore conference, Aberdeen, UK, 10 Sep 1985
Country of Publication:
United States
Language:
English