The current magnetohydrodynamic MHD program being implemented is a result of a consensus established in public meetings held by the Department of Energy in 1984. The public meetings were followed by the formulation of a June 1984 Coal-Fired MHD Preliminary Transition and Program Plan. This plan focused on demonstrating the proof-of-concept (POC) of coal-fired MHD electric power plants by the early 1990s. MHD test data indicate that while there are no fundamental technical barriers impeding the development of MHD power plants, technical risk remains. To reduce the technical risk three key subsystems (topping cycle, bottoming cycle, and seed regeneration) are being assembled and tested separately. The program does not require fabrication of a complete superconducting magnet, but rather the development and testing of superconductor cables. The topping cycle system test objectives can be achieved using a conventional iron core magnet system already in place at a DOE facility. Systems engineering-derived requirements and analytical modeling to support scale-up and component design guide the program. In response to environmental, economic, engineering, and utility acceptance requirements, design choices and operating modes are tested and refined to provide technical specifications for meeting commercial criteria. These engineering activities are supported by comprehensive and continuing systems analyses to establish realistic technical requirements and cost data. Essential elements of the current program are to: Develop technical and environmental data for the integrated MHD topping cycle system through POC testing (1000 hours); and bottoming cycle (4000 hours); design, construct, and operate a POC seed regeneration system capable of processing spent seed materials from the MHD bottoming cycle, prepare conceptual designs for a site specific MHD retrofit plant, and continue supporting research necessary for system testing. 7 figs.

Research Organization:
USDOE Assistant Secretary for Fossil Energy, Washington, DC (United States). Office of the Deputy Assistant Secretary for Oil, Gas, Shale and Special Technologies
Sponsoring Organization:
USDOE; USDOE, Washington, DC (United States)
OSTI ID:
5405950
Report Number(s):
DOE/FE-0239P; ON: DE91017916
Country of Publication:
United States
Language:
English