Condeep drainage systems speed consolidation
The foundation drainage systems underlying the 6 Condeep platforms installed in the North Sea have successfully speeded up the rate of sediment consolidation and stabilization of the platform. The systems on 2 of the first concrete gravity units have now been shut down after full consolidation. The drainage, or antiliquefaction system, is vital during the first storm periods before full consolidation has taken place. In the case of the last Condeep platforms installed on stiff clays, full consolidation has taken place within a period of 2 yr. As the base of each concrete gravity platform is divided into skirt compartments, it is possible to adjust the water pressure within each compartment separately and adjust for the tilting of the structure.
- OSTI ID:
- 5393535
- Journal Information:
- Offshore; (United States), Vol. 42:14
- Country of Publication:
- United States
- Language:
- English
Similar Records
Analysis of drainage and consolidation at typical uranium mill tailings sites
Observed settlements of five North Sea gravity platforms