Title: Tritium waste control, October 1979-March 1980

Technical Report ·
DOI:https://doi.org/10.2172/5364276· OSTI ID:5364276

Modifications were made to the Combined Electrolysis Catalytic Exchange (CECE) pilot unit. After the SPE cell was dismantled to investigate a water circulation problem, an internal short circuit developed. Analyses were done for impurities in the CECE system; the problem appears to be a 1 to 2% oil (mostly insoluble organics) layer. A polystyrene-impregnated, tritiated-concrete waste package was prepared with 7921 Ci of tritium. The study of tritium release from representative burial packages was continued. Gas generation rates were determined for polymer and non-polymer impregnated tritiated concrete and fixated and non-fixated tritiated waste vacuum pump oil. The pressure change of hydrogen cover gas over tritiated water on cement-plaster was determined.

Research Organization:
Mound Plant (MOUND), Miamisburg, OH (United States)
DOE Contract Number:
EY-76-C-04-0053
OSTI ID:
5364276
Report Number(s):
MLM-2714; TRN: 80-010413
Country of Publication:
United States
Language:
English