Title: Environmental Assessment for the Terminal Expansion Project.

Technical Report ·
OSTI ID:5344701

The Terminal Expansion Project is proposed by Bonneville Power Administration (BPA), Southern California Edison (SCE), and the Los Angeles Department of Water and Power (LADWP) to increase the operating capacity of the existing bipole direct current (dc) Intertie line between the Celilo Converter Station at The Dalles, Oregon, and the Sylmar converter Station at Sylmar, California. The proposal will allow a greater exchange of electric power between the Pacific Northwest (PNW) and Southern California without constructing new interregional transmission lines. By adding more alternating ac/dc converter equipment at the terminals, the conductors on the existing 845-mile dc intertie transmission line can be operated at full design capacity. The dc Intertie plus two other ac lines which terminate near San Francisco comprise the ''Intertie.'' Though the project is interregional, relatively little construction will be needed. This Environmental Assessment addresses the environmental impacts of the proposed actions and makes a determination as to their significance. Though LADWP is complying with the State environmental process, as required by the California Environmental Quality Act (CEQA), the impacts of their construction are being considered as part of the impacts of the overall proposal and are considered in the determination of significance.

Research Organization:
USDOE Bonneville Power Administration, Portland, OR. Office of Engineering and Construction
OSTI ID:
5344701
Report Number(s):
DOE/EA-0262; ON: DE86014007
Resource Relation:
Other Information: Portions of this document are illegible in microfiche products