Engineer, design, construct, test, and evaluate a pressurized fluidized-bed pilot plant using high-sulfur coal for production of electric power: Phase III. Pilot plant construction. Quarterly report, March 1-May 31, 1981
Progress in Phase III of the Engineering Program to design, construct, test and evaluate a pressurized fluidized bed pilot plant is reported. Phase III includes pilot plant fabrication, construction and initial check out. Fabrication of the upper and lower PFB combustor vessels is being followed by a short interval schedule and delivery is projected for July 15, 1981. Fabrication of component parts of the combustor recycle loop is on schedule. The recycle cyclone, freeboard tee, recycle cyclone tee, trickle valve and upper spool piece have all been received for the installation of refractory lining. The bellows assembly is scheduled for completion on July 15, 1981. Material handling equipment purchase orders were placed for the coal handling equipment, electric elevator, coal preparation, and ash handling equipment. Fire protection specifications were issued. The overall project is 43% complete. (LCL)
- Research Organization:
- Curtiss-Wright Corp., Wood-Ridge, NJ (USA). Power Systems Div.
- DOE Contract Number:
- AC21-76ET10417
- OSTI ID:
- 5344326
- Report Number(s):
- CW-WR-76-015.59A; FE-1726-59A; ON: DE82010237
- Country of Publication:
- United States
- Language:
- English
Similar Records
Engineer, design, construct, test, and evaluate a pressurized fluidized-bed pilot plant using high-sulfur coal for production of electric power. Phase III: construction. Annual report, March 1, 1980-February 28, 1981
Engineer, design, construct, test and evaluate a pressurized fluidized bed pilot plant using high sulfur coal for production of electric power. Phase III. Pilot plant construction. Final report
Related Subjects
42 ENGINEERING
FLUIDIZED-BED COMBUSTORS
FABRICATION
SAFETY STANDARDS
FOSSIL-FUEL POWER PLANTS
CONSTRUCTION
COAL
CARBONACEOUS MATERIALS
COMBUSTORS
ENERGY SOURCES
FOSSIL FUELS
FUELS
MATERIALS
POWER PLANTS
STANDARDS
THERMAL POWER PLANTS
200104* - Fossil-Fueled Power Plants- Components
421000 - Engineering- Combustion Systems