Foam insulation gets first reeled installation off Australia
- Esso Australia Ltd., Melbourne (AU)
Development in 1989 of Seahorse and Tarwhine fields in the Bass Strait, offshore Australia, promoted the first reeled installation of the thermally insulated pipeline system known as pipe-in-pipe (PIP). This paper reports that this system consists of an inner steel pipe coated with high-density polyurethane (HDPU) foam inside an outer steel carrier pipe. The offshore lines for which PIP was finally chosen are 7 and 10.8 miles, respectively, connecting the Barracouta offshore platform and subsea wellheads at each field location. Several alternative coating systems were evaluated, as report in Part 1 of this series. This conclusion chronicles coating application and shore fabrication of PIP for this project.
- OSTI ID:
- 5287984
- Journal Information:
- Oil and Gas Journal; (United States), Vol. 90:20; ISSN 0030-1388
- Country of Publication:
- United States
- Language:
- English
Similar Records
Application of low density foam pigs offshore Brazil
Snubbers, reeled pipe units feature portability, safety
Related Subjects
42 ENGINEERING
AUSTRALIA
OIL FIELDS
PIPELINES
THERMAL INSULATION
POLYURETHANES
PROTECTIVE COATINGS
DESIGN
FABRICATION
MATERIALS TESTING
OFFSHORE OPERATIONS
OIL WELLS
STEELS
WELLHEADS
ALLOYS
AUSTRALASIA
COATINGS
DEVELOPED COUNTRIES
GEOLOGIC DEPOSITS
IRON ALLOYS
IRON BASE ALLOYS
MATERIALS
MINERAL RESOURCES
ORGANIC COMPOUNDS
ORGANIC POLYMERS
PETROCHEMICALS
PETROLEUM DEPOSITS
PETROLEUM PRODUCTS
PLASTICS
POLYAMIDES
POLYMERS
RESOURCES
SYNTHETIC MATERIALS
TESTING
WELLS
022000* - Petroleum- Transport
Handling
& Storage
420205 - Engineering- Transport & Storage Facilities- (1980-)