Central heating plant modernization study for defense distribution Region East. Final report
Due to the age of its central heating plant (CHP) equipment and changes in energy industry environmental regulations, the Defense Distribution Region East (DDRE), New Cumberland, PA, began investigating modernization opportunities for its CHP. The U.S. Army Construction Engineering Research Laboratories (USACERL) was tasked with performing a central heating plant modernization study to determine viable options to provide energy for the coming years. Energy use patterns and the condition of existing equipment were determined, and five major potential energy supply alternatives were identified and evaluated on the basis of energy consumption and economics, including initial capital costs, annual fuel consumption, and annual Operations and Maintenance (OM) costs. For economy, it was recommended that boiler replacement be delayed until the year 2009, and that natural gas be used as fuel both before and after replacement, provided that funding for a natural gas pipeline can be obtained. If funding to replace the boilers does become available, the small difference in Life Cycle Cost should not delay DDRE from an immediate equipment upgrade.
- Research Organization:
- Army Construction Engineering Research Lab., Champaign, IL (United States)
- OSTI ID:
- 479103
- Report Number(s):
- AD-A-321266/9/XAB; CERL-TR-96/86; CNN: Contract MIPR-RPM93-0085; TRN: 71180317
- Resource Relation:
- Other Information: PBD: Aug 1996
- Country of Publication:
- United States
- Language:
- English
Similar Records
Energy supply options for modernizing Army heating systems. Final report
Application of expert systems for diagnosing equipment failures at central energy plants. Final report