Thermal removal of asbestos pipeline coating
Journal Article
·
· Pipeline and Gas Journal
OSTI ID:458495
- Natural Gas Pipeline Co. of America, Chicago, IL (United States)
A heat (thermal) technique, not previously used in the US for removing external pipe coating was used to remove asbestos-wrapped coating from 17 miles of 24-inch-diameter pipe. The process was conducted in compliance with all asbestos and air quality regulations, and produced asbestos-free pipe at timely and cost-effective rates.
- OSTI ID:
- 458495
- Journal Information:
- Pipeline and Gas Journal, Vol. 224, Issue 3; Other Information: PBD: Mar 1997
- Country of Publication:
- United States
- Language:
- English
Similar Records
Removal of Asbestos-Containing Coatings (ACC) from gas transmission pipelines. Final report, January 1991-October 1993
Asbestos--cement pipeline experience at the Raft River Geothermal Project
Asbestos removal system proves successful on 27-mile gas line
Technical Report
·
Sat Jan 01 00:00:00 EST 1994
·
OSTI ID:458495
Asbestos--cement pipeline experience at the Raft River Geothermal Project
Technical Report
·
Fri Apr 01 00:00:00 EST 1977
·
OSTI ID:458495
Asbestos removal system proves successful on 27-mile gas line
Journal Article
·
Fri Jul 01 00:00:00 EDT 1994
· Pipe Line Industry; (United States)
·
OSTI ID:458495