Prioritization for rehabilitation of buried lifelines
Abstract
Seismic rehabilitation or retrofit is a cost-effective way to prevent pipeline damage caused by future earthquakes. In general, it is very difficult, if not impossible, to rehabilitate all buried pipelines at the same time because of limited funds and time available. The purpose of this study is to establish a priority strategy for rehabilitation of buried pipelines considering several important factors such as pipeline damage probability, rehabilitation cost, rehabilitation rate (e.g. km/day), pipeline importance and total funds available.
- Authors:
-
- Old Dominion Univ., Norfolk, VA (United States)
- Publication Date:
- OSTI Identifier:
- 403462
- Report Number(s):
- CONF-9508226-
ISBN 0-7844-0101-2; TRN: IM9651%%497
- Resource Type:
- Conference
- Resource Relation:
- Conference: 4. U.S. conference on lifeline earthquake engineering, San Francisco, CA (United States), 10-12 Aug 1995; Other Information: PBD: 1995; Related Information: Is Part Of Lifeline earthquake engineering: Proceedings of the fourth U.S. conference; O`Rourke, M.J. [ed.]; PB: 823 p.; Technical Council on Lifeline Earthquake Engineering, Monograph number 6
- Country of Publication:
- United States
- Language:
- English
- Subject:
- 42 ENGINEERING NOT INCLUDED IN OTHER CATEGORIES; 03 NATURAL GAS; PIPELINES; RETROFITTING; NATURAL GAS DISTRIBUTION SYSTEMS; SEISMIC EFFECTS; MITIGATION; DECISION MAKING; PROBABILISTIC ESTIMATION; UNDERGROUND FACILITIES
Citation Formats
Wang, L R.L., Ishibashi, I, and Li, H. Prioritization for rehabilitation of buried lifelines. United States: N. p., 1995.
Web.
Wang, L R.L., Ishibashi, I, & Li, H. Prioritization for rehabilitation of buried lifelines. United States.
Wang, L R.L., Ishibashi, I, and Li, H. 1995.
"Prioritization for rehabilitation of buried lifelines". United States.
@article{osti_403462,
title = {Prioritization for rehabilitation of buried lifelines},
author = {Wang, L R.L. and Ishibashi, I and Li, H},
abstractNote = {Seismic rehabilitation or retrofit is a cost-effective way to prevent pipeline damage caused by future earthquakes. In general, it is very difficult, if not impossible, to rehabilitate all buried pipelines at the same time because of limited funds and time available. The purpose of this study is to establish a priority strategy for rehabilitation of buried pipelines considering several important factors such as pipeline damage probability, rehabilitation cost, rehabilitation rate (e.g. km/day), pipeline importance and total funds available.},
doi = {},
url = {https://www.osti.gov/biblio/403462},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Sun Dec 31 00:00:00 EST 1995},
month = {Sun Dec 31 00:00:00 EST 1995}
}
Other availability
Please see Document Availability for additional information on obtaining the full-text document. Library patrons may search WorldCat to identify libraries that hold this conference proceeding.
Save to My Library
You must Sign In or Create an Account in order to save documents to your library.