skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Design of a 110 MWth CFB boiler firing RDF, rejects, sewage sludge, wood waste and coal

Conference ·
OSTI ID:357860
 [1];  [2];  [3]
  1. RVL INVEST GmbH, Lenzing (Austria)
  2. Austrian Energy, Graz (Austria)
  3. LLB Lurgi Lentjes Babcock Energietechnik GmbH, Frankfurt am Main (Germany)

The consortium Austrian Energy and LLB Lurgi Lentjes Babcock Energietechnik GmbH was awarded the contract to build a 110 MWth CFB Plant in Lenzing, Austria. The plant will be started up in the fall of 1998 and is in the design state right now. The objective of the plant is to burn various fuels to overcome the challenges of waste fuel utilization. The main fuel to be burnt will be RDF. Additional fuels will be rejects, sewage sludge, wood waste and coal. The design of the plant is based on the Lurgi circulating fluidized bed technology. The boiler system and the fuel feeding systems will be supplied by Austrian Energy.

OSTI ID:
357860
Report Number(s):
CONF-9705116-; ISBN 0-7918-1557-9; TRN: IM9932%%205
Resource Relation:
Conference: 14. international conference on fluidized bed combustion, Vancouver (Canada), 11-16 May 1997; Other Information: PBD: 1997; Related Information: Is Part Of Proceedings of the 14. international conference on fluidized bed combustion: Volume 2; Preto, F.D.S. [ed.] [Canada Centre for Mineral and Energy Technology, Ottawa, Ontario (Canada). Energy Technology Centre]; PB: 647 p.
Country of Publication:
United States
Language:
English